知識経済の到来に従って、だんだん多くなる仕事は情報技術緊密な関係があります。時代の要求のもとで、すべての人の事業、求職の就業発展、ますますコンピュータとネットワーク技術方面の素質必要されています“E時代で、どのように自分を成功人にならせて、多い会社の合い争って招聘する人気がある人材になりますか?これみごとにドアーズ金の鍵を開けて、—IT専門技術の認証です。

現在国内のだんだん多くなりコンピュータ業界の人員が多種の方式で育成訓練を始めることにして、認証証明書を獲得します。特に、その年の大学卒業生と専門の証書を持ってない大志を抱く人は良い仕事を探し当てるため認証を取得します。はなはだもってはいくつかの海外留学生も証明書を持つことを将来国外の世渡りの本にもします。

以下は000-101の問題でございます、一緒に勉強しましょう

1. Which of the following statements is true regarding implementing Live Partition Mobility on two existing
POWER6 based systems?
A.The systems must use internal storage for boot purposes.
B.All virtualized ethernet adapters must be numbered below 10.
C.The mobile partition’s network and disk access must be virtualized.
D.Each system must be controlled by a different Hardware Management Console (HMC).
WArialCourier NewZ
ANSWER: C
2. Which of the following statements is true regarding virtual Ethernet redundancy?
A.Specifying an IP Address to ping is optional with Network Interface Backup (NIB) and is optional with
Shared Ethernet Adapter (SEA) failover.
B.Specifying an IP Address to ping is optional with Network Interface Backup (NIB) and is required with
Shared Ethernet Adapter (SEA) failover.
C.Specifying an IP Address to ping is required with Network Interface Backup (NIB) and is required with
Shared Ethernet Adapter (SEA) Failover.
D.Specifying an IP Address to ping is required with Network Interface Backup (NIB) and is optional with
Shared Ethernet Adapter (SEA) failover.
WArialCourier NewZ
ANSWER: D
3. Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?
A.System plan
B.System profile
C.Critical console data
D.VIO server partition profile
WArialCourier NewZ
ANSWER: A
4. A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system.
What information is important to analyze when deciding how to design the new machine using the System
Planning Tool?
A.vmstat and iostat data from the older machines
B.The number of CPUs that were installed in the original machines
C.Data from Workload Estimator (WLE) and IBM Performance Management (PM)
D.Performance data that is collected from the new system after it has been put into production
WArialCourier NewZ
ANSWER: C
5. The system administrator for a company plans to consolidate the workload of several ageing servers
onto a new Power server. The administrator’s intention is to virtualize all network and disk resources for
each LPAR in the new system using VIOS 1.x.
Which of the following is correct regarding MAC addresses and World Wide Port Names (WWPN) in a
client partition?
A.Each client LPAR will have its own MAC address and WWPN.
B.Each client LPAR will have no unique MAC address or WWPN.
C.Each client LPAR will have its own MAC address, but no unique WWPN.
D.Each client LPAR will have no unique MAC address, but will have its own WWPN.
WArialCourier NewZ
ANSWER: C
6. An administrator has a Power 570 in default configuration with a 4 port 1 Gbps Integrated Virtual
Ethernet (IVE) adapter. A new application requires that the MCS value for the first port group of the IVE
adapter be set to 1.
If this change is made, what is the maximum number of logical ports, across both port groups, that the IVE
adapter can provide?
A.4
B.16
C.20
D.32
WArialCourier NewZ
ANSWER: C